CIVIL ENGINEERING – Surgical Engineering Preserves Chimney in Azerbaijan

READ MORE – CIVIL ENGINEERING – THE MAGAZINE OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS

A historical industrial chimney in Azerbaijan has been structurally bolstered and preserved to eventually serve as the centerpiece of a new mixed-use development.

Azerbaijan

The 180 ft tall brick chimney, rescued from demolition and carefully preserved, will be the centerpiece of a twin tower development. © CINTEC International

January 5, 2016—The Azerbaijan capital of Baku is one of the largest and oldest ports on the Caspian Sea. The metropolitan area’s approximately 4 million residents can trace the rich history of the region back to the Bronze Age, and several prominent and preserved buildings in the city date to the 12 th and 13 th centuries. So it comes as no surprise that as the oil-rich area undergoes a dramatic urbanization leaders seek to maintain connections to an industrial past.

Historic Chimney Will Become Central Feature of Shopping Complex Thanks to Structural Preservation

READ MORE – Retrofit Magazine

READ MORE –  Building Design and Construction Magazine

Historic Chimney Will Become Central Feature of Shopping Complex Thanks to Structural Preservation

Cintec™ International is ensuring that a historic industrial chimney will be at the heart of the Twin Towers Port of Baku scheme.

A demolition-threatened historic chimney in the Azerbaijan capital of Baku will now be the center point of a multi-million pound new shopping complex thanks to the innovation of a Newport-based structural engineering firm.

Cintec™ International has been commissioned to carry out complex structural preservation work on the chimney later this year in a 1 million euro contract.

It was built in the 1900s as the focal point of a regeneration project to establish Baku as an up-and-coming center of commerce and technology.

Original designs for the development, which will be called The Twin Towers of Port Baku, planned to have the chimney pulled down to make way for the modern shopping complex. However, when the president of Azerbaijan saw the plans, he requested that the historical chimney be restored instead and become a central feature of the development.

Cintec™ Technology announces innovative new dissipative anchor

READ MORE – Canadian Consulting Engineer Sept 2015

READ MORE – CE NEWS Sept 2015

READ MORE – Masonry Magazine Sept 2015

READ MORE – Retrofit Magazine – Oct 2015

READ MORE – Association of the Wall & Ceiling Organization Feb 2016

Dissipative Wall Anchor Image

CINTEC International, a world leader in the field of structural masonry retrofit strengthening, repair, and preservation, announces that it has developed a new type of dissipative wall anchor. The new anchor solves the issues of how to protect heritage buildings in some of the most earthquake-prone parts of the world.

This new product is an innovative dissipative anchor designed for use with Cintec™’s proven wall anchor system.

“We believe that this anchor is a major breakthrough in further protecting the world’s iconic buildings, especially in areas of high seismic activity,” said Peter James, Managing Director of Cintec™ International. “This anchor has been four years in development within the NIKER program. It has undergone extensive testing at Bath University, and in Italy.”

1 6 7 8 9 10 11